Our news

How many hours can your company afford to be down: how to set realistic RTO and RPO

Screens with data and systems of a company, whose RTO and RPO should be set

RTO and RPO are the two figures that indicate how much your company can withstand an outage. RTO is the maximum downtime a system can endure before serious damage occurs. RPO is the maximum amount of data, measured in hours, that you can afford to lose.

Almost all small and medium-sized businesses (SMEs) have backups. However, very few know how long it would take to restore them. Therefore, we explain what each figure means, how to calculate it without technical jargon, and why it's important to check it before you need it.

What is the difference between RTO and RPO?

Recovery Time Objective (RTO) looks forward: how much time passes from the crash until you're back at work. Recovery Point Objective (RPO), on the other hand, looks backward: since the last good backup, how much work has been lost. For example, an RTO of four hours and an RPO of one hour mean you'll be back in four hours and will redo, at most, one hour of work.

RTORPO
What does it measure?Time until I go back to workData that is lost
Question that answersHow long can we stand still?How much work can we redo?
What does it depend on?From the recovery plan and having alternative systemsHow often are copies made?
Example4 hours1 hour

Why is saying «as soon as possible» not enough?

Because, in reality, «as soon as possible» can't be planned or budgeted for. Recovering a system in an hour costs much more than doing it in a day, and not all processes require it. On the other hand, setting specific figures allows you to spend where it matters and stop paying for protection that doesn't provide any benefit.

Furthermore, regulations already require it. The NIS2 directive includes business continuity and disaster recovery among its mandatory measures. Similarly, the National Security Scheme, regulated by the Royal Decree 311/2022, It requires impact analysis, a continuity plan, and periodic testing.

How to set a realistic RTO and RPO, step by step

Realistic RTO and RPO are based on the cost of each hour of downtime, not on what the technology promises. That's why we start with the business and finish with the systems. These are the steps we follow with our clients:

  1. Make the process list. Billing, orders, production, mail, customer service. What makes the company run.
  2. Calculate how much an hour costs without each one. Lost sales, idle staff hours, penalties, and angry customers.
  3. Sort by priority. Typically, two or three processes concentrate almost all the impact, so those come first.
  4. Put numbers on each one. A billing ERP system may need to be back up in four hours; a historical file can wait two days.
  5. Compare it to what you have today. If your backups are done overnight, your actual RPO is up to 24 hours, even if you need less.
  6. Test the recovery. Restore a system and measure the time. After all, it's the only way to know if the number is real.

The calculation in step 2 is what's known as business impact analysis. If you want to do it methodically, we explain how we do it on our page about [the topic]. BIA impact analysis.

What RTO and RPO values are typical for an SME?

There isn't a single figure; however, there are recurring ranges. In most industrial and service SMEs, critical systems can be back online within hours, while the rest can wait one or two days. In any case, the important thing is that each system has its own designated number, decided by management and not just by IT.

Systemusual RTOusual RPO
ERP and invoicing4 to 8 hours1 hour
Email and Microsoft 3654 hoursAlmost zero, with continuous copying
File server8 to 24 hours4 hours
Corporate website24 hours24 hours
Historical archive48 hours or more24 hours

The most frequent errors when setting the RTO and RPO

The most common mistake is never having tried a system restore. After all, a backup that has never been restored is just an assumption, not a guarantee. It's also common to forget that the Recovery Time Objective (RTO) includes everything: detecting the problem, making a decision, acquiring the necessary equipment, and reconfiguring access.

Another mistake is storing backups on the same network as the systems. For example, if ransomware encrypts the server, it can also encrypt the backups, thus increasing the recovery time (RTO) to days or weeks. That's why we recommend one backup stored off-network and another that cannot be modified.

How can Apen help you set your RTO and RPO?

At Apen, we analyze which processes cannot be stopped and how much each hour of downtime costs you. Then, using that data, we set an RTO and RPO for each system, adjust backups, and prepare a plan to meet them. Finally, we test it with you to ensure the numbers are realistic. This is how we do it in our service. business continuity for companies.

We've been working with SMEs in Vallès and Barcelona for over 35 years. Request your free assessment and we'll tell you how long it would take you to get back to work today.

Frequently Asked Questions

What do RTO and RPO mean?

RTO is the maximum time a system can be down. RPO is the maximum amount of data you can lose, measured in time since the last valid backup.

Who decides on the RTO and RPO in a company?

Direction, with the help of computer science, since it is a business decision: how much an hour of downtime costs and how much you want to invest to avoid it.

How often should the RTO and RPO be checked?

At least once a year, and whenever something important changes: a new ERP, a relocation, or a staff increase.

Is a lower RTO always better?

No. The lower the RTO, the more expensive it is. That's why it makes sense to reserve short RTOs for processes that actually generate revenue or serve customers.

How do you verify that the RTO is real?

Restoring a system in a test and measuring the time from start to finish. Furthermore, if it takes longer than expected, the plan needs to be adjusted.

Are RTO and RPO mandatory?

For companies affected by NIS2 or ENS, continuity and recovery are mandatory, and in practice require setting these figures.